Illustrative report
Renovation of Pir-e Sabz going on
The ceiling of Pir-e Sabz Shrine is being built


Yazd, Amordad correspondent:  Members of Pir-e Sabz Renovation Committee visited the Shrine on 8 Bahman (28 January)
This visit, which was done after building the ceiling and strengthening the shrine columns, a report was prepared about the work done for repair and renovation of the Pir.
Destroying the arch ceiling on the east wing, leaving the main and side beams intact, and removing the rust from the beams were part of the work done in the past weeks.
Hormozdyar Khosravi, Behmard Khosravi, Sohrab Salamati, Bahman Timsari, Farzad Shahriyarifar and Mazyar Salamati were members of the visiting team







photographer: Farzad Shahriyarfar
Translation by Rowshan Lohrasbpour